The majority of the drilling program, including the 800m producer lateral, was successfully wrapped up on Sept 2, 2021. The Pilot producer well was spudded on Augusing Akita Drilling Ltd.’s (“Akita”) Rig 29. The drilling and completions program of the Pilot involved the successful completion of the producer well and the deployment of two RF XL transmission lines into the heating well horizontals. RF XL is a next generation, patented, low-cost, non-aqueous recovery solution which could yield low-to-zero scope 1 and scope 2 GHGs to produce heavy oil and oil sands. (“Acceleware” or the “Company”) (TSXV: AXE), a Canadian clean-tech innovator of radio frequency (RF) heating technologies that enable the electrification of industrial heat and promise a dramatic reduction in greenhouse gas (GHG) emissions, today announced that the Company has finished its drilling and completions program for the commercial-scale RF XL pilot project at Marwayne, Alberta (the “Pilot”), and has initiated facilities installation, representing a major milestone in the execution of the Pilot. CALGARY, ALBERTA – Decem– Acceleware Ltd.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |